We were initially opposed to the placement of the garage entrance due to health concerns of residents contiguous to the site, specifically cars cuing to enter the proposed structure. After attending the community meeting on March 2nd at Bret Harte School, we were still unclear as to where the actual entrances to the parking structure would be.  A response to our continued questions revealed that there were some hard parameters set by SFMTA for traffic on Arelious Walker and a significant push by our Supervisor to ramp up public transportation to the area earlier than is customary with such projects.  This led us to having a meeting with SFMTA representatives that have been working on transportation planning for the project and we now understand more fully the changes that have been made to the entrances to the parking structure as well as the transit plans for the area.  As long as plans continue to contain the entrances to the parking structure as outlined on the attached Vehicle Access Plan, we will not oppose moving forward with the project. 
 

 

 

October 6, 2015

 

Dear Neighbors - Silverado, one of our Candlestick Point contractors, will have its second over-wide equipment removal from the site tomorrow, Wednesday, October 7th. The transportation vehicles will have permits to transport the equipment, however these “permitted loads” require the moving of the equipment to occur before 6AM to get off of the city streets and state highways (to comply with SFPD and CHP requirements). 

In order to comply with Caltrans and City and County of San Francisco regulations, the oversized loads carrying large equipment will be transported between 3AM and 6AM. The equipment removal for tomorrow morning is scheduled for 4am. The load will be leaving the Candlestick Parking lot from the gate on Hunters Point Expressway, farthest away from any residences. Efforts will be made to minimize noise and disturbance. As need for similar work arises, you will be notified. Those dates have not yet been scheduled. 

Thank you 

La Shon A. Walker 
Director of Community Affairs 
Lennar Urban 
1 Sansom St. Suite 3200 
San Francisco, CA 94104 
415-995-1770 extension 848 
415-344-8848 
lashon.a.walker@lennar.com

 

 

Sept 30, 2015

 

Dear Neighbors - One of our Candlestick Point contractors (Silverado), has some over-wide equipment that they will be removing from the site tomorrow, Thursday, October 1st. The transportation vehicles will have permits to transport the equipment, however these “permitted loads” require the moving of the equipment to occur before 6AM to get off of the city streets and state highways (to comply with SFPD and CHP requirements). 

In order to comply with Caltrans and City and County of San Francisco regulations, the oversized loads carrying large equipment will be transported between 3AM and 6AM. The load will be leaving the Candlestick Parking lot from the gate on Hunters Point Expressway, farthest away from any residences. Efforts will be made to minimize noise and disturbance. As need for similar work arises, you will be notified. Those dates have not yet been scheduled. 

Thank you 

La Shon A. Walker 
Director of Community Affairs 
Lennar Urban 
1 Sansom St. Suite 3200 
San Francisco, CA 94104 
415-995-1770 extension 848 
415-344-8848 
lashon.a.walker@lennar.com

Call us:

415-468-9168

©2014 Bayview Hill Neighborhood Association

Proudly created with Wix.com

  • Facebook Social Icon